So 2010 is here and back to work it is!
Over the festive break the majority of my work was on two modules:
Digital Media Project:I managed to get more surveys done, and create two personas and carry out more data gathering and analysis. I also got all the suer testig done for my prototypes and uploaded the video evidence of this.
http://www.youtube.com/watch?v=tJItdYrFgcY - framework user testing
http://www.youtube.com/watch?v=t8hqIPmFBEA - lofi prototype interactivity
Consultancy Project:
I have assigned the specific roles and job titles within the project and then looked at my assigned roles and made a lsit of all the individual jobs in each section.
I have created a hi-fi prototype which is ready to be tested and hopefully we will be able to do so in the next month.
I have also uploaded a framework online and coded a few php scripts to get the uploading of events page working and the search engine working.